The Yass Pool Redevelopment Project Committee, at its meeting held on 17 July, suggested that further pricing be sought from aquatic engineers to review the options of a heated pool with upgrades to the existing 50m pool.
They have finally received a report on that at their September meeting.
The options include:
• Refurbish 50m pool to include accessibility ramp into pool – include Myrtha Pools technology or equivalent and
• Option to enclose the existing 50m pool to create a 50m indoor heated pool or
• Option to enclose 25m of the existing 50m pool to create a 25m heated pool with overhead structure or
• Construct a new 25m x 6 lane indoor heated pool – include Myrtha Pools technology or equivalent (location TBC).

Quotes to include OPC (Opinion Probable Cost) for each option.
Council undertook a request for quotations for a review of the above options, with the amount being circa $25,000. The committee said the amount exceeds the allocated funding of $20,000.
They deliberated options, one of which could be to reduce the scope of works re-quested from the preferred aquatic engineer to exclude:
• Option 1– Enclosing the existing 50m pool and/or
• Option 2 – Enclosing 25m of the existing 50m pool
They said this may bring the cost of the review within the current allocated budget for the pool redevelopment project. The Yass Pool Redevelopment Project Committee, at its July meeting, suggested that further pricing be sought from aquatic engineers to review the options of a heated pool with upgrades to the existing 50m pool.

The options include:
• Refurbish 50m pool to include accessibility ramp into pool – include Myrtha Pools technology or equivalent and
• Option to enclose the existing 50m pool to create a 50m indoor heated pool or
• Option to enclose 25m of the existing 50m pool to create a 25m heated pool with overhead structure or
• Construct a new 25m x 6 lane indoor heated pool – include Myrtha Pools technology or equivalent (location TBC).
Quotes to include OPC (Opinion Probable Cost) for each option.

Council undertook a request for quotations for a review of the above options, with the amount being circa $25,000. The amount exceeds the allocated funding of $20,000.
An option to consider could be to reduce the scope of works requested from the preferred aquatic engineer to exclude:
• Option 1– Enclosing the existing 50m pool and/or
• Option 2 – Enclosing 25m of the existing 50m pool
They said this may bring the cost of the review within the current allocated budget for the pool redevelopment project.

The South West Slopes Times covers an area approximately the size of Fiji in country NSW. We look after a population of more than 50,000 people with our staff servicing 7 major towns and dozens of villages with our story telling footprint.
We offer weekly print editions at $3 a copy and we also offer digital subscriptions across 3 months $30, 6 months $60 and 12 months $120.
We are one of the last truly local independent family run newspaper businesses in the state.
Contact us today to find out how we can promote your business or organisation across our huge network by emailing ads@thetimes.net.au or by calling 0413 763 216.
If you have a news tip, lead or scoop for us please make contact as we love celebrating our communities. You can contribute articles via our South West Slopes Times website.